English Original Reader for Technical Students. Power transformers: short-circuit testing, monitoring systems (Smart Grid)

Год написания книги
2022
Теги
1 2 3 4 5 ... 8 >>
На страницу:
1 из 8
Настройки чтения
Размер шрифта
Высота строк
Поля
English Original Reader for Technical Students. Power transformers: short-circuit testing, monitoring systems (Smart Grid)
Александр Юрьевич Хренников

Учебно-методическое пособие "English Original Reader for Technical Students. Power transformers: short-circuit testing, monitoring systems (Smart Grid). Diagnostics of electrical equipment» – новая разработка с использованием оригинального английского технического языка и проверкой носителями языка. Материал по чтению для студентов вузов и колледжей, магистрантов, бакалавров, аспирантов электротехнических специальностей. Пособие состоит из четырех глав: Monitoring Systems (Smart Grid) and Diagnostics of Electrical Equipment Faults, Diagnostics and transformer testing experience by LVI/FRA methods, Shortcurrent Testing Laboratories. Short-circuit performance of power transformers, transformer testing experience, Diagnostics by infra-red and ultraviolet control, partial discharges for detection of electrical equipment’s faults, defects.В конце каждой главы имеются упражнения на понимание текста, пополнения специального словарного запаса и закрепление пройденного материала.

Александр Хренников

English Original Reader for Technical Students. Power transformers: short-circuit testing, monitoring systems (Smart Grid)

This book is dedicated to the memory of my father Khrennikov Yurij Alexandrovich

This book is dedicated to the memory of my father Khrennikov Yurij Alexandrovich.

He was an Electrical Engineer and took part in the building of seven hydroelectric power stations.

Abbreviations

IMS-Information-measuring systems;

LVI–Low Voltage Impulse;

FRA-Frequency Response Analysis;

T-controlled power transformer;

TV-voltage transformer;

CT-current transformer;

B-high-voltage circuit breaker;

L-inductance;

ANR-accidental and non-regime;

RW-regulation winding;

DGA-Dissolved Gas Analysis;

ADC-analog-to-digital converters;

RMSD-root-mean-square deviation;

AFC-amplitude-frequency characteristic;

HV-high voltage (winding);

LV1-first low voltage (winding);

LV2-second low voltage (winding);

MV-medium voltage (winding);

HEPS-Heat Electric Power Station;

µsec-microsecond;

JSC “FGC UES”-Joint Stock Company “Federal Grid Company of

Unified Energy System”;

STL-Short-current Testing Laboratory;

SREPS-State Regional Electric Power Station;

IR-control-infra-red control;

PD-partial discharges;

TG-turbo-generator;

DC-direct current

DO-digital oscillograph;

GIS-gas insulated switchgear;

SAWP-specialized automated working place;

TCS-technical condition state;

IEPS AAN-Intellectual electric power system with the active-

adaptive network;

M&R-maintenance and repair;

EMF-electromotive force;

OA-operational amplifier;

EDS-expert- diagnostic system;

TREE-transformer and reactor electrical equipment;

ETCS-electrotechnical complexes and systems;

DM-diagnostic models;

DF-diagnostic feature;